Trades in a bathroom refurbishment

Reading Time: 5 minutes | Article from 16.7.2024
Share

If you have been searching for a full list of trades, Villeroy & Boch has just what you need. Which tradesperson installs washbasins and which trade handles electrical work in a building project? You can find an overview of the main trades here.

Content

  • Main trades involved in a bathroom renovation
  • Sequence of trades in a bathroom renovation
  • Find local plumbers with Villeroy & Boch

At a glance

  • Each trade has a clear area of responsibility.

  • Tilers often grout their own work. Alternatively, you can call in an expert. 

  • Tasks involving electricity always need an electrician or electrical contractor.

What are trades and which ones are there?

The term "trade" generally refers to the different types of construction work carried out on a building site. These manual and technical tasks are handled by specialist companies.

The site manager is responsible for coordinating and monitoring the different trades working on a construction project. The site manager also ensures adherence to the budget, building regulations and safety measures. At the end of the project, the site manager approves the trade works. 

Planners and architects

Visionary designers of your dream bathroom

Planners and architects are the people who plan and design the technical and economic aspects of a construction project. They know the requirements for each individual project – from legal aspects to the client's needs and building regulations. A bathroom architect works out measurements and plans individual installations such as pipes and tubes, in particular in the case of a complete refurbishment. 

Plumbers

Experts in sanitary ceramic installation

The answer to the questions "Who installs washbasins" or "Who installs a shower tray" is clear: plumbers or fitters. Plumbers are responsible for installing sanitary facilities, including washbasins, baths, showers, toilets and bidets. They also install taps. In addition to these tasks, plumbers fit connections and pipes and are involved in both new builds and renovations. They also install heating systems throughout the building.

Bricklayers

Surface preparation and tiling professionals

Bricklayers are responsible for constructing the shell of the building. In existing buildings, bricklayers also prepare the substrate for subsequent work. Insulation is a task for bricklayers too, although above-ground insulation work is usually carried out by painters or plasterers.

Top view of a modern bathroom with a toilet, a washbasin with a mirror, a beige floor with a wooden texture and a white shower with a red accent wall. Gold and red accessories are visible.
Modern bathroom with an orange-coloured Artis washbasin, a round mirror, a beige Finion vanity unit and minimalist decor
A modern bathroom in a monochrome colour scheme with bathroom ceramics and fittings from Villeroy & Boch in classic black.


A modern bathroom with dark wood accents and an Antao bathtub and beige sinks.

Everything you need for your feel-good bathroom

Look forward to modern design ideas, care tips and exclusive benefits in our newsletter. 

 

As a welcome gift, we are giving you a 10% discount on your first order in the Dining & Lifestyle area - ideal for decorative highlights in the bathroom.[0]

The following trades are also involved:

Correct sequence of trades

What is the correct planning sequence for trades in a construction project? We explain the ideal order of work:

  1. First, find an architect or planner to handle the initial planning phase and later take on the role of site manager. 

  2. It is then time for the bricklayers and drywaller builders to start the shell construction and interior work. 

  3. By this point at the latest, several trades will need to work together. Preparatory work for plumbing and electrical installations usually takes place in parallel. 

  4. Once the preparatory work has been completed, further work can be carried out by the drywall builder. Screed is laid at this point, for example. 

  5. The tiler then lays the floor and wall tiles.

  6. The main work is now carried out by plumbers and electricians. 

  7. The tiler is usually responsible for grouting the bathroom after the sanitary ceramics have been installed.

  8. Finally, you can find painters and decorators to decorate the remaining walls.

Info:

The site manager oversees the correct sequence of trades during a construction project. This person ties all the threads together. As the client, you naturally have a say in which companies you would like to use.

Expert assistance for every occasion

Service and advice

A modern guest bathroom with a ViClean-I200 shower toilet and Artis washbasin.

Planner

The online Bathroom Planner will help you plan your dream bathroom tailored to your wishes and requirements in just a few steps.

Go to the Bathroom Planner
Modern showroom interior with illuminated bathroom idea displays showcasing the latest Villeroy & Boch products.

Find a dealer

Find your nearest Villeroy & Boch dealer and get expert advice on our products.

Find a dealer
Villeroy & Boch employees working at desks in an open-plan office, one employee giving advice on a video call.

Video advice

Use our video advisory service for your individual bathroom planning: discuss all the details of your bathroom project with our experts online.

Get advice online

Top product categories

  • Gourmet plates
  • Table cutlery
  • Decanter
  • Wall-mounted washbasins
  • Rimless toilets

Get to know our Professional Portal for specialised partners

To the Professional Portal

Change your settings


© Villeroy & Boch Group 2026

  • Privacy Policy
  • Cookie Policy
  • GTC of use
  • Legal Notice
  • Statement of accessibility
  • Customer Feedback
  • Tax Strategy